Vantage Data Centers Fact Sheet — Trident at Windler, Aurora CO
Project overview
Fact Sheet
Trident Data Center at Windler - A Hyperscale Data Center
Critical Context
The Cumulative Burden of 5 Data Centers in Close Proximity
Each new data center proposal must be evaluated not as a standalone project, but as an additive layer on top of existing industrial load — a standard known as cumulative impact assessment.
Scientific Evidence
Physiological Impacts of 24/7 Industrial Noise at 350 Feet
Peer-reviewed evidence on chronic low-frequency noise exposure and its effects on residents.
Industry Claims vs. Reality — Data Center Myths Debunked
Data Center Myths
Nine claims the data center industry repeats — and the facts that tell a different story.
Policy & Zoning Reform
Aurora's UDO Must Be Updated for the Data Center Era
Why hyperscale facilities over 50 MW should be classified as heavy industry and why data centers need their own dedicated zoning category.
Technical Report
Environment and Health Analysis
Independent technical analysis of environmental and public health impacts associated with the proposed Trident Data Center development.
Vantage Data Centers Fact Sheet — Trident at Windler, Aurora CO
Community Fact-Check
What Vantage Says — and What the Record Shows
Comparing Vantage's community PR flyer against technical filings with the City of Aurora, Xcel Energy, and CDPHE.
Public Health Alert
Diesel Generators — 28 Tier 2 Engines
Vantage has proposed 28 Tier 2 diesel backup generators — two full tiers below the current EPA best-available standard.
Public Safety Alert
Hazardous Diesel Fuel Storage & Gas Station Comparison
Full buildout stores 600,000–1,000,000+ gallons of diesel — 30× to 100× a neighborhood gas station — 350–500 feet from homes.
Generator Yard Discussion
Trident Generator Yard Public Summary
A plain-language summary of the proposed generator yard layout, diesel generator specifications, and proximity to residential neighborhoods at the Trident Data Center site.
Community Briefing
Trident Data Center at Windler — 2-Page Briefing Paper
A concise two-page overview of the proposed 500 MW Trident Data Center at Windler: key facts, community impacts, and what neighbors need to know about the DA-1707-46 application.
Developer & Name
Proposed by Denver-based Vantage Data Centers (Denver Office Address: 821 17th St, Denver, CO 80202) and officially named the "Trident Data Center at Windler".
Location
23001 E 48th Ave, Aurora, Colorado.
Situated on approximately 108 acres in eastern Aurora.
Located east of Tibet Road and north of 48th Ave near the northwest corner of E-470 and E. 48th Ave., in the E-470 and 48th Avenue corridor, which is part of the Windler master-planned community in northeast Aurora.
Property Details
Parcel Number: 0182113404001
Legal Description: WINDLER SUBD FLG 3 BLK 1 LOT 1
Project Contacts & Details
City Record/Case Number: DA-1707-46
City Staff Project Manager: Connor Bailey, Senior Planner 1, 303.739.7121, cbailey1@auroragov.org
Vantage Contact: Misty Allen (misty.allen@vantage-dc.com), Vice President of Public Policy, North America, at Vantage Data Centers
Size
The entire campus will comprise two two-story buildings totaling nearly 860,000 square feet. In addition, there will be an Xcel electric sub-station, a backup electric generator grid and it's proposed to have 28 Diesel backup generators spread across the two buildings.
Cooling & Water Capacity
Operates on a closed-loop cooling system that recycles water. It requires an initial fill of 800,000 gallons for the first building, with a total estimated need of 1.6 million gallons of water for the fully built campus. This water system will purportedly only need to be flushed about once in ten years.
Staffing
Expected to average about 50 full time employees on-site daily.
Infrastructure
The project includes the construction of a switching station for Xcel Energy, an Excel Sub-Station, and the installation of backup power generators.