Community Proposals
Proposed Mitigations
The following mitigations have been identified by community members as necessary conditions for any approval of the Trident Data Center at Windler. We invite Vantage Data Centers to engage with these proposals in good faith.
The Case for a Pause
Why a Moratorium Is Necessary
The full argument — from unquantified pollution and water impacts to absent UDO noise standards — is on the Council Advocacy page.
Critical Context
The Cumulative Burden of 5 Data Centers in Close Proximity
The Trident proposal does not exist in isolation. The Aurora region already hosts or has approved multiple large-scale data center facilities within a tight geographic cluster. Regulators and residents must evaluate each new project not as a standalone impact, but as an additive layer on top of existing industrial load — a standard known as cumulative impact assessment.
Air Quality & Diesel Exhaust
Each facility runs backup diesel generators during testing and outages. Five facilities in proximity means five overlapping NOx and particulate plumes — compounding ozone formation and fine-particle exposure for the same neighborhoods, schools, and senior communities.
Power Grid Strain
The Trident facility alone is projected to draw more than 500 MW — nearly double the upper range of a typical hyperscale data center. Combined with four additional facilities competing for the same regional grid capacity, the cumulative demand accelerates costly infrastructure upgrades that utilities pass directly to ratepayers — the same dynamic Loudoun County residents have experienced with power bills doubling and tripling.
Water Consumption
Evaporative cooling towers consume millions of gallons annually per facility. In a semi-arid region already under water stress, five co-located facilities represent a compounding draw on the same aquifer and municipal supply systems.
Noise & Vibration
Cooling equipment, generators, and HVAC systems produce constant low-frequency hum. With multiple facilities operating simultaneously in the same corridor, ambient noise floors rise permanently — with no quiet hours and no seasonal relief.
Traffic & Infrastructure
Construction phases, shift-change traffic, and heavy delivery vehicles from five projects overlap on the same arterial roads. Cumulative wear, congestion, and safety impacts fall on local streets not designed for industrial-scale throughput.
Property Values & Community Character
Research consistently shows industrial clustering depresses adjacent residential property values. A single facility may be absorbed; a corridor of five transforms the character of surrounding neighborhoods in ways that are difficult or impossible to reverse.
What This Means for Mitigations
Every mitigation listed below must be evaluated against the cumulative baseline — not just Trident's individual footprint. Noise limits, emissions caps, water allocations, and traffic studies should account for the full industrial load already approved or operating in this corridor. Anything less understates the real impact on residents.
Why Mitigations Matter
Data centers of this scale bring significant and lasting impacts to surrounding neighborhoods — noise, light, traffic, water use, and emergency response demands that will be felt for decades. Mitigations are not optional extras; they are the minimum conditions under which a project of this size can be considered compatible with an established residential community.
The proposals below reflect input gathered from residents, environmental advocates, and technical experts. They are organized by impact category and are intended as a starting point for structured dialogue with Vantage Data Centers and the City of Aurora.
Noise & Vibration
Independent Noise Monitoring
The City of Aurora must establish an enforceable, dual-metric nighttime safety boundary at the residential property line between the hours of 10:00 PM and 7:00 AM. Compliance requires simultaneous adherence to three independent, co-equal thresholds: a maximum sound pressure level of 45 dBA—consistent with World Health Organization (WHO) standards for community noise—paired with an unyielding ceiling of 55 dBC, and a maximum allowable variance where the C-weighted level shall not exceed the A-weighted level by more than 15 decibels (Lₙₑₖ − Lₐₑₖ ≤ 15 dB).
This dual limitation and delta cap are scientifically mandatory because standard dBA metrics incorporate an electronic weighting curve that mathematically erases low-frequency industrial noise. In contrast, C-weighted and Z-weighted (unweighted) metrics capture the long-wavelength, high-energy acoustic emissions generated continuously by data center cooling infrastructure.
Mandating that the architectural variance (Lₙₑₖ − Lₐₑₖ) remain at or below 15 dB is the only mathematically reliable way to prevent low-frequency environmental imbalance. When the dBC level exceeds the dBA level by more than 15 decibels, it serves as a definitive diagnostic indicator of severe, low-frequency sound intrusion.
Because these low-frequency acoustic waves possess a physical profile that allows them to bypass standard residential building envelopes—easily penetrating windows, doors, and walls via acoustic diffraction—they cause profound indoor structural resonance. When this acoustic disparity is left un-capped, this low-frequency energy inflicts severe, documented health impacts on nearby residents, including acute sleep pattern disruption, chronic nervous system stress, and elevated cardiac risks, even when the sound registers below standard audible thresholds.
Rather than relying on arbitrary spatial setbacks, forcing a strict, simultaneous dBA, dBC, and 15 dB delta cap at the property line legally binds developers to integrate specialized low-frequency silencing skids, acoustic barriers, and active cancellation engineering directly into the facility design.
Operational Noise Limits
Establish enforceable noise limits of no more than 45 dB(A) at the nearest residential property line during nighttime hours (10 PM – 7 AM), consistent with WHO guidelines for community noise. We would also expect that mitigation will be made to the very intrusive dB(C) levels, and the dB(Z), low level sound intrusion. The differences between dB(A) noise that you can audibly hear daily and dB(C) and dB(Z)very low level noise that we cannot here, yet is nevertheless so intrusive in our lives, is quite different in the way that it effects people. The dB(C) levels and dB(Z) levels are very long sound waves, that travel long distances and they easily bend allowing them to infiltrate through objects, doors, windows, even the walls of a home creating disturbance in sleep patterns and causing nervousness, irritability and cardiac issues, even though you cannot audibly hear this low pitched sound. This begs for at least a 2-3 mile distance between the site and the nearest residence.
Generator Testing Restrictions
Limit backup generator testing to weekday daytime hours only (9 AM – 4 PM), with advance notice to neighbors and a cap on total monthly testing duration.
Nighttime Dual Noise Limit — 55 dB(C) and 45 dB(A) at Property Line
Mandate a dual nighttime noise limit of 55 dB(C) and 45 dB(A) measured at the residential property line between 10 PM and 7 AM to protect the health and sleep of nearby residents.
Why a Dual Standard Is Necessary: A single dB(A) limit is scientifically insufficient for hyperscale data center regulation. dB(A) weighting was designed to approximate light human hearing sensitivity and heavily attenuates low-frequency sound — at 63 Hz it filters out approximately 26 dB, and in the infrasound range it attenuates over 40 dB. A facility can mathematically pass a dB(A) threshold while simultaneously flooding a neighborhood with low-frequency mechanical noise that causes documented neurological harm.
dB(C) at Night — The Health-Protective Standard: The 55 dB(C) nighttime limit captures the low-frequency hums, structural vibrations, and mechanical energy from cooling towers, chillers, and transformers that dB(A) masks entirely. Public health researchers and the World Health Organization identify low-frequency noise as a primary driver of sleep disruption, cardiovascular stress, and cognitive impairment in residents living near industrial facilities.
dB(A) at Night — The Baseline Companion Limit: The companion 45 dB(A) nighttime limit addresses mid- and high-frequency tonal noise — fan blade harmonics, electrical hum, and broadband mechanical noise — that residents perceive as intrusive even when low-frequency energy is controlled.
Enforcement: Both limits must be measured simultaneously at the nearest residential property line using calibrated Type 1 sound level meters. Exceedance of either limit — not just one — constitutes a violation. Compliance reports must be filed monthly with the City and made publicly available.
Mandate dB(C) and dB(Z) Noise Measurement Standards — The Regulatory Weighting Gap
Current Aurora municipal zoning code relies almost exclusively on dB(A) weighting — a measurement scale that was designed to mimic light human hearing by heavily filtering out low-frequency sound. At 63 Hz, dB(A) attenuates approximately 26 dB; in the infrasound range it attenuates over 40 dB. This means a hyperscale data center can mathematically pass a dB(A) regulatory threshold while simultaneously flooding a neighborhood with heavy, nerve-fraying low-frequency vibrations.
dB(A) — The Current Flaw: Filters out and ignores low-frequency hums and vibrations. A facility can claim full regulatory compliance under dB(A) while emitting ILFN that causes documented neurological harm to residents.
dB(C) — The Environmental Standard: Provides a flat, unattenuated response across low frequencies. Leading public health researchers advocate for dB(C) because it accurately captures the low-frequency mechanical noise and structural building vibrations from HVAC systems, chillers, and transformers that induce human stress and sleep loss.
dB(Z) — The Zero-Bias Line: Represents an absolute, mathematically flat frequency response (8 Hz to 20 kHz) with zero filtering. It captures the raw physical energy of sound waves. For a technically rigorous municipal review, dB(Z) octave-band analysis is required to map the specific blade-pass frequencies of massive cooling fans.
Policy Recommendation: A 350-foot setback is physiologically insufficient. The City Council must mandate a comprehensive sound study that accounts for full octave-band frequency thresholds including enforceable dB(C) and dB(Z) limits — not merely dB(A) — to protect the nervous systems of residents living adjacent to this facility. The current regulatory framework is legally blind to the most harmful emissions hyperscale data centers produce.
Water Use
Water Consumption Cap
Impose a binding annual water consumption cap with automatic operational restrictions triggered if usage exceeds agreed thresholds, particularly during drought conditions declared by the State of Colorado.
Recycled Water Mandate
Require the facility to connect to Aurora Water's recycled water system for all cooling tower makeup water within 24 months of operations commencing, eliminating potable water use for cooling.
Annual Water Audit
Require an independent annual water audit with results submitted to the City of Aurora and made available to the public, including a breakdown of water use by system.
Closed-Loop Chemical Waste Management — Five Required Mitigations
The Trident facility uses a true closed-loop air-cooled chiller system, which means it does not produce continuous cooling tower blowdown discharge during normal operations. Aurora's ordinance banning large-scale evaporative cooling is a meaningful protection, and the Trident design conforms to it.
However, a closed-loop system is not chemically inert. The sealed piping infrastructure requires an initial fill of 800,000 gallons per building — 1.6 million gallons total — of water treated with specialized additives including antifreeze agents, corrosion inhibitors, and biocides. This chemically treated volume must be drained and replaced during commissioning, hydrostatic pressure testing, major mechanical overhauls, and eventual decommissioning. Each of those events generates a large volume of industrial chemical waste that must be managed, transported, or discharged somewhere.
Without binding conditions in the conditional use permit, there is no legal mechanism preventing that waste from being discharged directly into Aurora's municipal sewer system — at public expense, through infrastructure not designed to treat it, and without any notification to Aurora Water or CDPHE.
To safeguard Aurora's infrastructure and ensure private operating liabilities are not shifted onto public ratepayers, the following six mitigation requirements must be incorporated into any conditional use permit or site plan approval:
1. Mandatory Public Chemical Disclosure
The developer must provide a full, unrestricted inventory of all specialized closed-loop chemical additives — including antifreeze agents, corrosion inhibitors, and biocides — proposed for use at the Trident campus. This inventory must be updated annually, made part of the public record, and automatically forwarded to CDPHE.
2. Prohibition of Raw Sewer Discharge for System Flushes
Direct, un-metered discharge of closed-loop system flush water, hydrostatic testing fluids, or chemical commissioning wastewater into the Aurora municipal sewer system must be strictly prohibited. All bulk water drained during commissioning or mechanical overhauls must be classified as industrial waste.
3. Mandatory On-Site Pre-Filtration and pH Balancing Prior to Any Discharge
The developer must design, construct, and maintain a permanent, on-site pre-filtration and pH neutralization system capable of treating the full volume of closed-loop water released during any system flush, scheduled cleaning cycle, or catastrophic event — including pipe failure, chiller rupture, or emergency drain-down.
Pre-filtration must remove suspended solids, particulate corrosion byproducts, and residual biocide compounds to concentrations at or below municipal discharge limits before any water contacts the sewer connection point. pH neutralization must bring all discharged water within the range of 6.0 to 9.0 standard units, consistent with Metro Water Recovery and Aurora Water industrial pretreatment standards.
This requirement applies without exception to all discharge events — planned or unplanned. A catastrophic event does not constitute a waiver. The developer must maintain sufficient on-site chemical neutralization reagents, filtration media, and emergency containment capacity to manage a full single-loop drain-down (minimum 800,000 gallons per building) at any time. Failure to maintain this readiness constitutes a permit violation independent of whether a discharge event has occurred.
All pre-filtration and pH treatment equipment must be inspected quarterly by a licensed industrial wastewater engineer, with inspection reports submitted to Aurora Water and posted publicly on the City's planning portal within 30 days of each inspection.
4. Real-Time Automated Discharge Monitoring & Interlocking Shut-Offs
The developer shall fully fund, install, and maintain continuous, automated water-quality and flow-metering telemetry infrastructure at the facility's primary sewer effluent connection point. Real-time diagnostic data measuring pH, temperature, and specific chemical indicators must be actively linked to Aurora Water systems. This tracking mechanism must be hardwired to an automated, mechanical isolation valve configured to instantly shut off the connection if permitted safety thresholds are breached. Monitoring stations must operate continuously throughout all phases of facility operation, including commissioning, routine maintenance, and decommissioning, with all recorded data made available to Aurora Water in real time.
5. Binding Infrastructure and Cost Recovery Agreement
The developer must execute a legally binding agreement to indemnify the City of Aurora against any infrastructure degradation, pipeline corrosion, or wastewater treatment failures directly attributable to the facility's discharge. Any incremental oversight or testing costs incurred by Aurora Water must be fully reimbursed by the developer through an annually adjusted cost-recovery mechanism.
The underlying principle is unchanged: a private data center developer must bear the complete operational and financial responsibility for safely managing its industrial chemical waste. Aurora ratepayers must not be forced to subsidize the risks or costs of treating concentrated industrial fluids generated by a private facility operating for private profit.
Traffic & Infrastructure
Construction Traffic Management Plan
Require a detailed construction traffic management plan approved by the City before any grading begins, including designated haul routes that avoid residential streets, enforced hours for heavy truck movements, and a community liaison for complaints.
Road Repair Bond
Require Vantage to post a road repair bond sufficient to restore any public roads damaged by construction traffic to pre-construction condition, verified by independent inspection.
Employee Transportation Plan
Require a Transportation Demand Management plan for the facility's ~120 daily employees, including shuttle service from transit hubs and incentives to reduce single-occupancy vehicle trips.
Light & Visual Impact
Full Cutoff Lighting
Require all exterior lighting to use full-cutoff fixtures that direct light downward only, with no upward light scatter, and a maximum illuminance of 0.1 foot-candles at the residential property line.
Landscape Screening Buffer
Require a minimum 100-foot landscaped buffer along all sides of the property adjacent to residential uses, planted with mature evergreen trees at a density sufficient to provide year-round visual screening within five years.
Emergency Response
Dedicated Emergency Access
Require a dedicated emergency vehicle access route that does not pass through residential streets, coordinated with Aurora Fire Rescue and Aurora Police Department before occupancy.
Hazardous Materials Disclosure
Require full disclosure of all hazardous materials stored on-site (including battery storage chemicals and refrigerants) to Aurora Fire Rescue, with annual updates and community notification of any significant changes.
Air Quality & Emissions
Replace Planned Tier 2 Diesel Generators with Tier 4 Final Generators
Require that all 28 emergency backup generators installed at the Trident facility meet EPA Tier 4 Final emissions standards — not the Tier 2 standard currently referenced in Vantage's application materials.
Tier 2 vs. Tier 4 Final — What the Difference Means for Residents:
Tier 2 generators, which represent older EPA emissions standards established in the early 2000s, emit significantly higher levels of nitrogen oxides (NOx) and particulate matter (PM2.5) than modern equipment. Tier 4 Final is the most stringent EPA emissions standard for diesel engines, requiring up to 90% reduction in NOx and up to 95% reduction in PM2.5 compared to Tier 2 equipment.
With 28 generators on-site — each capable of running continuously during a grid outage — the cumulative air quality impact of Tier 2 equipment would be substantial. PM2.5 particles are small enough to penetrate deep into lung tissue and enter the bloodstream, causing respiratory disease, cardiovascular harm, and elevated cancer risk. NOx emissions contribute to ground-level ozone formation, which is already a documented concern in the Aurora airshed.
Tier 4 Final generators are widely available from all major manufacturers and are standard equipment in data center projects built to modern environmental specifications. The cost differential between Tier 2 and Tier 4 Final equipment is modest relative to the overall project budget and does not represent a meaningful financial hardship for a developer of Vantage's scale.
Requiring Tier 4 Final generators is not an extraordinary ask — it is the baseline standard that any responsible operator building adjacent to a residential community should voluntarily adopt. The City of Aurora should make it a binding condition of approval.
Community Benefit
Community Benefit Agreement
Negotiate a binding Community Benefit Agreement (CBA) with the Windler neighborhood association prior to any final approval, covering local hiring commitments, community fund contributions, and ongoing liaison obligations.
Ongoing Community Liaison
Require Vantage to designate a permanent community liaison, a named individual with direct authority, reachable by residents during all hours of operation, with a documented response time commitment for complaints.
Residential Setback
Minimum 2–3 Mile Setback from Residential Communities
Require a minimum setback of 2 to 3 miles between any large-scale data center facility and the nearest established residential community. The Trident Data Center at Windler is proposed at approximately 350 feet from existing homes — a distance wholly inadequate to protect residents from the full spectrum of environmental impacts generated by a facility of this scale operating 24 hours a day, 365 days a year. Hyperscale Data Centers fit the description of Heavy industry standards, not light industry and should be treated as such, which mandate quite different safety and health requirments.
Why a 2–3 Mile Setback Is Necessary: Noise Pollution
Low-frequency dB(C) and dB(Z) sound waves generated by cooling systems, backup generators, and electrical infrastructure travel far beyond the facility boundary. Unlike audible dB(A) noise, these long-wavelength pressure waves penetrate walls, windows, and building structures, disrupting sleep, elevating stress hormones, and causing chronic cardiovascular effects in residents who may not even consciously hear the source. A 2–3 mile buffer provides the minimum distance at which these waves attenuate to levels consistent with residential health standards.
Why a 2–3 Mile Setback Is Necessary: Light Pollution
A facility of 860,000 square feet operating around the clock requires extensive exterior lighting for security, operations, and safety. This produces significant sky glow and horizontal light spill that degrades sleep quality, disrupts circadian rhythms, and diminishes quality of life for nearby residents. At 500 feet, the facility's lighting will be a constant and inescapable presence. A 2–3 mile setback ensures that light levels at the nearest homes remain within acceptable limits without relying solely on shielding measures that are difficult to enforce and maintain over decades.
Why a 2–3 Mile Setback Is Necessary: Air Quality
Data centers of this scale operate diesel backup generators that are tested regularly and activated during grid outages, releasing particulate matter, nitrogen oxides, and other combustion byproducts. Cooling tower systems can also generate aerosol drift containing chemical treatment additives. At close proximity, these emissions accumulate in the breathing zone of residential neighborhoods. A 2–3 mile setback provides meaningful atmospheric dispersion distance, reducing the concentration of airborne pollutants reaching homes to levels that do not pose acute or chronic health risks.
Why a 2–3 Mile Setback Is Necessary: Water & Groundwater Protection
The facility's closed-loop cooling system holds over 1.6 million gallons of chemically treated water containing carcinogenic and hazardous compounds. Any overflow, drainage failure, or catastrophic release poses a direct contamination risk to the local groundwater and stormwater system. The closer the facility is to residential areas, the shorter the travel time for contaminants to reach private wells, drainage channels, and community water infrastructure. A 2–3 mile setback provides a critical buffer zone that reduces the risk of contamination reaching residential water supplies before detection and remediation can occur.
Why a 2–3 Mile Setback Is Necessary: Electromagnetic Energy
Large-scale data centers generate substantial electromagnetic fields (EMF) from high-voltage power infrastructure, switching stations, uninterruptible power supplies, and dense server hardware operating continuously. The Xcel Energy switching station required to power this facility adds further to the electromagnetic environment. While regulatory standards for EMF exposure exist, they were largely established for short-duration or occupational exposure — not for residents living in continuous proximity for years or decades. Emerging research links chronic low-level EMF exposure to sleep disturbance, neurological effects, and other health concerns. A 2–3 mile setback is a precautionary minimum that reflects the scale of this facility and the permanence of its impact on the surrounding community.
Frequently Asked Questions
What is the current air quality in our area, and why does it matter?
The Windler community and surrounding Aurora neighborhoods already experience elevated levels of ground-level ozone and fine particulate matter (PM2.5), placing the area in or near non-attainment status under EPA standards on high-pollution days. Adding 28 diesel backup generators — each capable of running for extended periods during grid outages or testing — introduces a significant new source of NOx and PM2.5 emissions into an airshed that is already stressed. Residents with asthma, COPD, cardiovascular disease, or other respiratory conditions face disproportionate risk.
What is cumulative impact, and why does it matter here?
Cumulative impact refers to the combined effect of multiple pollution sources on a community over time. The E-470 corridor already hosts several existing data center campuses. Adding the Trident facility — and potentially a second proposed facility near Aurora Highlands — means residents would be exposed to the combined noise, air, light, and electromagnetic impacts of multiple large industrial operations simultaneously. Standard permitting processes evaluate each project in isolation and do not account for this cumulative burden. Community advocates are calling for a comprehensive cumulative impact assessment before any further approvals are granted.
Can the cooling system contaminate our water supply?
The Trident facility uses a true closed-loop air-cooled chiller system — not open evaporative cooling towers — which means it does not produce continuous chemical discharge to the municipal sewer during normal operations. However, the sealed system requires an initial fill of 1.6 million gallons of chemically treated water that remains permanently pressurized inside the piping. During commissioning, hydrostatic testing, major overhauls, and eventual decommissioning, this chemically treated volume must be drained — and without binding permit conditions, there is no legal mechanism preventing that industrial waste from being discharged directly into Aurora's municipal sewer at public expense. Six specific mitigations — including a prohibition on raw sewer discharge, mandatory off-site hauling or on-site pretreatment, and a binding cost recovery agreement — are required conditions of any approval.
What is the difference between dB(A) and dB(C) noise, and why does it matter?
dB(A) is a frequency-weighted noise measurement that approximates what the human ear consciously hears. dB(C) measures low-frequency sound pressure across a much broader range, including very long sound waves that the ear does not perceive as distinct noise but that the body still registers as physical pressure. Low-frequency dB(C) energy from cooling systems and generators travels long distances, bends around barriers, and penetrates walls and windows. It disrupts sleep, elevates cortisol and adrenaline, and causes chronic cardiovascular stress — even in residents who report not hearing anything unusual. Standard noise ordinances are written in dB(A) and do not capture this impact. Separate dB(C) limits are essential.
What is PM2.5 and why is it dangerous?
PM2.5 refers to fine particulate matter with a diameter of 2.5 micrometers or less — small enough to bypass the body's natural respiratory defenses and penetrate deep into lung tissue and the bloodstream. Exposure to PM2.5 is linked to asthma attacks, reduced lung function, heart attacks, stroke, and premature death. Diesel generators are a significant source of PM2.5. With 28 generators on-site, the Trident facility represents a substantial new PM2.5 source in a residential airshed. Requiring Tier 4 Final generators — which reduce PM2.5 emissions by up to 95% compared to older Tier 2 equipment — is a minimum standard for a facility of this scale.
What is ground-level ozone and how does it form?
Ground-level ozone is not emitted directly but forms when nitrogen oxides (NOx) and volatile organic compounds (VOCs) react in sunlight. Diesel generators are a major source of NOx. Ozone is a powerful lung irritant that causes chest pain, coughing, throat irritation, and worsening of asthma and other respiratory diseases. The Aurora area already experiences elevated ozone levels on hot summer days. Adding a large new NOx source from 28 diesel generators — particularly during summer grid stress events when generators are most likely to run — would worsen ozone conditions precisely when they are already at their worst.
Why do residents demand a 2–3 mile setback?
The 2–3 mile setback demand reflects the combined reach of all impact categories: low-frequency noise, light pollution, air emissions, electromagnetic fields, and water contamination risk. At 500 feet — the current proposed distance — residents would be within the primary impact zone of every one of these effects simultaneously, for the entire operational life of the facility. A 2–3 mile buffer is the minimum distance at which these impacts attenuate to levels consistent with residential health and quality-of-life standards. It is not an arbitrary number; it reflects the scale of a facility generating 500 megawatts of total electrical demand operating continuously.
Why can't berms and sound walls solve the noise problem?
Berms and sound walls are effective at attenuating mid- and high-frequency audible noise (dB(A)), but they provide little protection against low-frequency dB(C) sound pressure waves. These long-wavelength waves diffract around and over barriers, and penetrate solid structures including concrete walls and earthen berms. A facility of this scale, operating 24 hours a day with cooling systems and 28 backup generators, will generate substantial dB(C) energy that no practical barrier can fully contain at a distance of 500 feet. Berms and walls are useful supplementary measures but cannot substitute for adequate setback distance.
What other data centers are in the area — existing and proposed?
The Trident Data Center at Windler is not being proposed in isolation. Existing facilities near the Trident site include: NTT Data Center (approximately 1.5 miles northwest, off E. 48th Ave near Himalaya Road); QTS Aurora Data Center (approximately 2.5 miles west, near E. 40th Ave and Himalaya Road); CyrusOne Aurora Campus (approximately 3 miles west along the E-470 corridor); and Aligned Data Centers (approximately 3.5 miles southwest near the I-70 / E-470 interchange area). Two major proposed projects add further urgency: the Aerotropolis Data Center — proposed for a site in close proximity to the Trident location within the E-470 Technology Corridor — and a Microsoft data center campus also proposed in the same corridor. Neither proposed project has been evaluated in combination with Trident or the existing facilities, meaning residents face five or more major data center campuses operating simultaneously with no comprehensive cumulative impact review ever conducted. The proposed Trident facility would sit within 0.5 miles of The Reserve at Windler, 0.8 miles of Green Valley Ranch, and 1.2 miles of Traditions and Harmony. This concentration is a central reason community advocates are demanding a moratorium on new approvals until Aurora's UDO is updated to properly regulate hyperscale data centers.
Join the Conversation
Share your perspective on the proposed mitigations and help shape the conversation about this project.